Water Facilities Engineering

Carroll’s experience ranges from the permitting of source to the design of water supply, storage, treatment and distribution facilities for small and large communities – with the overall goal of preserving this precious natural resource. CEC applies its considerable proficiency in water facilities consulting to supply walls, water treatment, booster stations, storage tanks, transmission mains, distribution mains and system modeling for communities both small and large. The firm’s expertise, supported by the latest technology, ensures economical, high-quality systems. Recent project experience includes use of arsenic absorption technology for arsenic removal to comply with new EPA standards.

Water Facilities Engineering Services at Carroll Engineering include:

  • Permitting
    • NPDES
    • Public Water Supply
    • Water Quality
    • Storage Tanks
  • Storage
  • Treatment and Purification Plants
    • Conventional Filtration Systems
    • Direct Filtration
    • Arsenic Removal
    • Iron and Manganese Removal
  • Distribution

 

“John Swenson, P.E. of Carroll Engineering Corporation, provides
high-quality, personalized services with specific unmatched experience
in the field of environmental engineering. The combination of this
expertise blended with integrity and high ethical standards sets him
apart from the competition. I would highly recommend his services
to anyone who wants honest and high quality engineering services.”

Benjamin W. Jones, CEO, Bucks County Water & Sewer Authority

Contact Us

Carroll’s Featured Water Facilities Engineering Projects


Solebury Tank Re-Painting
Client: Bucks County Water and Sewer Authority, Solebury Township, Bucks County, PA

Solebury Tank Pic

CEC provided design services and construction management for the recoating of this existing 500,000 gallon elevated water storage tank. Originally constructed in 1987 and was recoated in 2012 (interior and exterior) while the water system was temporarily interconnected to the nearby New Hope Water System. A temporary pumping and piping system was installed over the ground surface during the installation so that water service and fire protection was maintained while the tank was out of service.

New Hope Water System
Client: Bucks County Water and Sewer Authority, New Hope Borough, Bucks County, PA

New Hope Water 1
New Hope Water 2

CEC provided the design and construction management for a new public water system, including a 500,000 gallon storage tank, 3 well stations, a booster pump station and public water mains. These facilities were installed to provide a reliable water supply and fire protection to the Borough to replace individual private wells.